Mechanical Systems Replacement
The project entailed the installation of two multi-zone rooftop units, along with the necessary ducting. New gas piping was also installed to support the operation of the rooftop units. In addition, a retrofit was conducted to implement a Direct Digital Control (DDC) system for improved control and monitoring. As part of the project, thorough duct cleaning was performed on all existing distribution systems to ensure optimal functionality.